You, the prime contractor, must indemnify Saudi Aramco against any loss, claim, or fine resulting from your subcontractor’s acts or omissions. There is no cap on this indemnity.

Saudi Aramco's Schedule G is a standard contract supplement that dictates critical project management, quality control, and inspection requirements for contractors. It acts as a binding framework to ensure that all engineering, procurement, and construction (EPC) projects meet the company's rigorous safety and operational standards.

: Saudi Aramco provides specific items—such as specialized steel pipes or long-lead equipment—at no cost to the contractor. While Aramco owns these materials, the contractor is legally responsible for their safeguarding, preservation, and proper integration into the project.

Promptly returning unused materials to avoid penalties or "missing item" disputes during demobilization. 3. Material Sourcing & Standards

Saudi Aramco reserves the right to perform random physical inventory checks, audits, and site inspections to ensure compliance. 4. Key Attachments Often Found in Schedule G Attachment Description Attachment I List of Company-Supplied Materials Attachment II List of Company-Supplied Tools and Equipment Attachment III Materials requiring specific Saudi sourcing Attachment IV Guidelines for selecting material sources or see how monthly material reports should be formatted?

Schedule G serves as a rigorous HSE manual (specifically Doc No. SA-DWO-HSERM-002-R0

For any contractor entering the Saudi Aramco ecosystem, the "Schedule" documents are the DNA of your contract. While Schedule A handles general terms, is where the rubber meets the road for logistics and operations. It governs the Materials and Equipment required to execute your project.

is one of the most critical documents for project managers and procurement teams Essentially, Schedule G serves as the rulebook for Materials, Tools, and Equipment

Schedule G often includes several attachments that detail specific requirements:

Saudi Arabia’s Vision 2030 places immense emphasis on localized employment. Under Schedule G, Aramco enforces strict compliance with the Nitaqat program.

When purchasing materials, the contractor must give preference to Saudi manufacturers.

This article provides an in-depth overview of the Saudi Aramco Schedule G, outlining contractor responsibilities, company-supplied items, and compliance requirements to ensure smooth project execution. 1. What is Saudi Aramco Schedule G?

Aramco regularly leverages its massive purchasing power to procure high-lead items globally.