Pwd Dsr 2017-18 Maharashtra Hot! Jun 2026
For specific details, statistics, and insights into the PWD Maharashtra's 2017-18 activities, it is recommended to consult the official annual report or publications released by the department.
: Rates in the 2017-18 book were generally compiled as exclusive of GST, with the tax added separately at the final abstract level of the project estimate. How Contractors and Engineers Use This Data
Before a tender was floated, government engineers used the DSR to prepare for the proposed work. Each work item was assigned a DSR item code, and the quantity of each item was multiplied by the DSR rate to arrive at the total estimated cost.
The serves as the official benchmark for estimating costs for government construction projects across the state. This specific edition is notable for its adaptation to the introduction of the Goods and Services Tax (GST) in mid-2017 . Key Features & Regional Variations Pwd Dsr 2017-18 Maharashtra __exclusive__
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later. pwd dsr 2017-18 maharashtra
The PWD DSR 2017-18 for Maharashtra includes the following key features:
Foundation (bored piles), substructures, bearings, and superstructures. Electrical Works
| Item | Unit | Mumbai (₹) | Nagpur (₹) | Difference | |------|------|------------|-------------|-------------| | Sand (river) | m³ | 1,850 | 1,250 | +48% (transport to Mumbai) | | Coarse aggregate 20mm | MT | 1,420 | 990 | +43% | | Brick (modular) | 1000 nos | 6,800 | 5,200 | +31% | | Unskilled labor | day | 485 | 395 | +23% (higher minimum wage in Mumbai) | | RCC M20 concrete | m³ | 5,850 | 5,050 | +16% |
The 2017-18 revision was notable for adapting to the economic landscape, which included the implementation of GST. Key features of this schedule include: For specific details, statistics, and insights into the
The PWD Electrical Wing issues its own CSR for electrical installation, lighting, wiring, and cabling, which was also updated for the 2017-18 period. 4. How to Use the PWD DSR 2017-18
Despite significant achievements, the PWD faced several challenges, including delays in project completion, budget constraints, and the need for more sustainable and resilient infrastructure in the face of climate change.
: Separate rates for Plain Cement Concrete (PCC) and Reinforced Cement Concrete (RCC) based on mix designs (e.g., M20, M25, M30).
To understand the obsolescence and inflation, compare a single item: Each work item was assigned a DSR item
The DSR 2017-18 witnessed a 12-15% rise in earthwork rates compared to 2015-16 due to increased diesel prices and labor wage revisions under the Maharashtra Minimum Wages Act.
: Often cited in contract agreements to resolve disputes regarding work valuation. Key Features of the 2017-18 Schedule
Many versions of this schedule, especially those finalized in late 2017, took into account the introduction of GST, impacting material costs (excluding taxes from the base rate calculation).